LineDrop References

Werkhof Olten

2 new charging points now in service for electric vehicles

Project Details

Operator / Developer
Werkhof Olten
Werkhofstrasse 9
4600 Olten

Completion
February 2026

Charging infrastructure

Number of charging stations 2
Charging power 100–150 kW per charging point
Charging system EVTEC
Charging cable CCS 250A

Project Description

Werkhof Olten continues to invest in future-oriented infrastructure and relies on the cable management system from MIBAG AG.

Two LineDrop systems were installed in the workshop hall, enabling safe and efficient energy supply directly from the ceiling. These systems are primarily used for charging Meili electric vehicles as well as electric waste collection vehicles that are in daily municipal operation.

The overhead cable solution ensures greater organization, reduces tripping hazards, and simplifies handling in everyday work processes — a clear advantage in a heavily used workshop environment.

We would like to sincerely thank Werkhof Olten for the trust they have placed in us and are pleased to contribute to the sustainable development of the municipal vehicle fleet.

Services Offered by MIBAG AG

Integration and delivery of the LineDrop system.